Event Works
Client: Align JV
Project: Colne Valley Viaduct Completion Celebration Event
The brief: In September 2024, HS2 reached a historic milestone with the completion of the Colne Valley Viaduct deck, the longest rail bridge in the UK. This monumental achievement was to be marked with a high-profile celebration event, designed to honour the incredible efforts of the engineering teams and showcase the project’s final completion. The event was to be held in an active construction site, requiring innovative planning to create a safe yet engaging experience for all attendees.
Hosting a large-scale event in a live construction environment posed significant logistical challenges. A key requirement was creating a segregated, PPE-free zone while ensuring safety standards were met. Additionally, unpredictable September weather threatened the outdoor setting.